top of page
Two (2) Siemens SGT 600 gas turbines

Two (2) Siemens SGT 600 gas turbines, 25 MW, 50 hz, 10500 volt, 2011 year, dual fuel, Rebuilt, 6 month delivery Condition: Rebuilt, Location: Europe
bottom of page

Two (2) Siemens SGT 600 gas turbines, 25 MW, 50 hz, 10500 volt, 2011 year, dual fuel, Rebuilt, 6 month delivery Condition: Rebuilt, Location: Europe