top of page

Product Description: GE LM6000 PC Sprint Gas Turbine Generator Sets (2 Units)

High-Efficiency 88MW Power Solution for Grid, Utility & Industrial Applications

High-Efficiency 88MW Power Solution for Grid, Utility & Industrial Applications

For inquiries or to schedule a site inspection, contact:

Jeff Robinson – Metaverse Ventures, Inc.
📞 (225) 341-0776
📧 jeff.robinson@metaverseventure.net

Data Power Supply is offering two (2) fully rebuilt GE LM6000 PC Sprint gas turbine generator sets, available for immediate deployment. Each unit delivers approximately 44 MW of site output (47.3 MW ISO rated) and is equipped with Brush generators and complete auxiliary systems. These low-hour machines underwent major overhauls in 2022 and are engineered for rapid-start, high-efficiency power generation.

Key Specifications

  • Model: GE LM6000 PC Sprint (Spray Intercooling for power boost)

  • Fuel: Natural Gas

  • Total Output: ~88 MW combined at 60 Hz

  • Emissions: NOx ≤ 25 ppm (with water injection)

  • Heat Rate: 8,200 BTU/kWh (ISO standard)

  • Generator: Brush BDAX 7-290ERJT | 71.2 MVA | 13.8 kV

  • Overhaul: Completed in 2022 with fewer than 2,700 hours since service

  • Condition: Excellent – ready for fast-track integration

Included Systems

  • Water-injected combustion turbines

  • Acoustic enclosures and redundant ventilation

  • Advanced air filtration and soak wash systems

  • Integrated microprocessor controls with Modbus/Ethernet

  • Bentley Nevada vibration monitoring

  • Independent auxiliary transformers (2x 2500/3333 kVA)

  • Fire detection and suppression system

  • Balance of plant auxiliaries

Exclusions

  • Main step-up transformers

  • HV switchgear and site-specific infrastructure

  • Fuel treatment systems and freight/logistics services

Sales Terms

  • Price: $25,000,000 per unit | $50,000,000 for both

  • Condition: As-is, where-is (USA-based)

  • Inspection: Available with NDA

  • Warranty: None included; third-party warranty available upon request

  • Note: Units are container-integrated—must be purchased together

End User Agreement (Req'd)
bottom of page