Immediate Delivery: Two LM6000s in a Market Facing 5–7 Year delay
- DPS
- Aug 18
- 2 min read
Two LM6000 Turbines Available Now: Beat the 5–7 Year Wait
Across the global energy sector, one of the biggest roadblocks for developers, utilities, and data center operators isn’t funding or permitting—it’s equipment availability. In particular, new gas turbines are facing unprecedented lead times of 5 to 7 years.
That means a project breaking ground today may not see its critical power generation assets delivered until the 2030s. For mission-critical operations, that’s simply not acceptable.
But right now, in the middle of this supply chain gridlock, Data Power Supply has two GE LM6000 natural gas turbines available for immediate delivery.
The LM6000: A Proven Workhorse
The GE LM6000 is one of the most widely deployed aeroderivative turbines in the world, with a proven track record of delivering:
Up to 50 MW of power per unit
10-minute start-up time for fast-response backup or peak demand
High efficiency and low emissions compared to older-frame turbines
Fuel flexibility, with future-ready pathways to hydrogen blends
For large-scale projects—from data centers to utilities—this is the gold standard for reliable, dispatchable power.
The Harsh Reality: 5–7 Year Waits
Today’s supply chain realities mean:
OEM production is oversold well into the next decade.
Even well-financed projects can’t get turbines delivered on schedule.
Developers risk losing contracts, clients, and opportunities simply because the hardware isn’t available.
This bottleneck has put critical growth on hold in industries where uptime is everything.
Why This Opportunity Is Different
That’s what makes this availability so rare. Data Power Supply has secured two LM6000 turbines in the middle of this global shortage.
Instead of waiting until 2030 or later, your project could be operational within months—not years.
For data center operators, utilities, or industrial developers, this isn’t just a chance to buy turbines—it’s the difference between leading the market or falling behind it.
Act Before They’re Gone
With global demand at an all-time high, opportunities like this don’t last. If you’re facing a multi-year delay on your power generation project, these LM6000 units could keep your timeline—and your business—on track.
📩 Contact info@datapowersupply.com today to secure specifications, pricing, and delivery options.
Data Power Supply: Not just powering the future, but helping shape it.